HOME > PRODUCT
DIE & MOLD
Factory Introduction
■ windowless building
It is designed to be suitable for the production of pharmaceutical packaging materials and is built to be unaffected by the external environment.
Application of auto feeding system
The auto-feeding room is set aside to automatically supply raw materials, thereby maintaining the cleanliness of the production site and eliminating the risk of cross-contamination of raw materials and contamination of foreign substances.
Introduction of vision inspection system
Equipped with a certain ability to select products by introducing BOTTLE and CAP VISION INSPECTION MACHINE
■ Clean room design
The constant temperature and humidity system manages suspended particles in the air to maintain constant cleanliness at all times.
CESCO management (proof, insect repellent)
Produced in a safer environment by managing pest control through systematic management by professional companies
ISO15378 certified
Systematic production maintenance management through certification of primary packaging materials for pharmaceuticals and cosmetics
BOLW MOLD
The most common and universal mold for producing BOTTLE
In general, cavities of 1-4 products are put in, and it is suitable for small-lot production of various products and large-capacity products.
Mold production period is 20 days on average, and there are differences depending on the cavity
INJECTION MOLD
As a mold for producing CAP products, it is a mold that is used in various fields without restrictions on usage.
It is a mold that can best express the desired shape, and there is a difference in mold cost depending on the shape and cavity.
Mold production period is 45-60 days on average
IBM MOLD
A mold for making containers, which is a combination of injection + brow mold
Mold cost is high, but it is advantageous for cost reduction, so it is selected when converting from small quantity production to mass production
Mold production takes an average of 50-60 days
3D Print
Used when mocking up a product, used when you want to make a design or shape of a product in advance
There is a difference in the production period depending on the presence or absence of modeling, but generally mock-up is possible within 3-5 days